Tennis Court Installation

The pictures below were taken before and after the installation of poly tennis turf manufactured by playfield. The istallation of this court took about three days and the turf was installed sirectly over the top of the existing blacktop. For more information about our tennis turf please contact Dan Bjorkman

Equipment used for the installation of the grass

4 to 6 inches of 3/4" road base was installed and compacted over the old surface to fill any crack and voids. After this process we installed the new turf . See the pictures below.

Here are the pictures of the court after the turf installation was completed

This picture is of the finished tennis court.  It plays great. This close up of the lines shows the detail of the 2 1/4" service line. This line is tufted in the mfg process.